Introduction

The following information presents the results of project analysis performed for the Congestion Management Program (CMP). Projects are scored based on various metrics derviced from the model (e.g., change in volume).

The two tables below presents the point categories and possible values. Note that transit mode share is only applied to transit projects.

Performance Measure Increase No Change Decrease New Road Cong Road
Change in V/C Ratio 0 2 5 3
List of Congested Roadways 1
Transit Mode Share 3 1 0
VMT 0 1 2
VHT 0 1 2
VHD 0 1 2
Volume Increase Points
No Increase 0
1 - 499 1
500 - 999 2
1000 - 1499 3
1500 - 1999 4
2000 - 2499 5
2500 - 2999 6
3000 - 3499 7
3500 + 8

Project Scores

Model ProjID Project Name Project Description Length Current Lanes Future Lanes Cost (000s) Score
19 Kamehameha Highway Widening 1.90 3 4 160,300 16
32 Makakilo Dr New Location 2.48 0 4 83,900 15
111 Central Mauka Road Second Access Added Capacity 16.19 0 4 NA 14
25 Kapolei Parkway Widening and Extension 1.28 0 4 53,000 13
102 H-1 Widening Waipahu Off-Ramp Added Capacity 0.23 1 2 NA 13
103 H-1 University Avenue Interchange On/Off Ramp Modifications Realignment 0.41 1 1 NA 13
105 Kunia Road Widening Added Capacity 6.28 2 4 348,900 13
112 Wahiawa Second Access Added Capacity 3.25 0 2 NA 13
115 Roosevelt Extension Added Capacity 0.29 0 2 NA 13
4 Fort Barrette Road Widening 1.25 2 4 50,000 12
5 Fort Barrette Road Widening & New Location 0.28 2 4 13,200 12
29 Kualaka’i Parkway Widening 2.36 4 6 180,000 12
107 Likelike Highway Widening Added Capacity 0.49 4 6 NA 12
113 Waianae Second Access Added Capacity 4.85 0 2 1,269,000 12
120 Kunia Road Widening Added Capacity 0.37 5 6 NA 12
124 Farrington Highway (short) Widening 0.70 4 6 34,500 11
30 Kualakai Pkwy Extension New Location 0.35 0 4 20,000 11
31 Kualakai Pkwy Extension Widening 0.35 0 2 180,000 11
110 Puuloa Road Widening Added Capacity 0.69 3 5 NA 11
41 East-West Arterial New Location 3.88 0 2 NA 10
42 UHWO Roads New Location 2.68 0 2 NA 10
122 Kahekili Highway Widening 3.32 2 4 NA 10
2 Farrington Highway Widening 7.20 4 6 252,000 9
22 Kamokila Boulevard New Location 0.65 0 4 28,700 9
24 Kapolei Interchange Complex Phase 2 Interchange 0.43 0 1 139,000 9
104 H-1 HOV Median Lanes Added Capacity 4.97 0 2 NA 9
106 Kunia Interchange Improvements Added Capacity 0.05 varies varies 160,000 9
34 Moanalua/Kamehameha Off-Ramp Widening 0.47 2 3 NA 6
33 Makakilo Mauka Frontage Road Frontage Road 0.54 0 1 18,200 3




Systems Analysis Group, WSP & Caliper Corporation 2021